How to Fast-Track Your Critical Risk Management Implementation (Without Cutting Corners)

When it comes to implementing a Critical Risk Management (CRM) framework, one of the most common questions we hear is:

“Is there a way to fast-track the process?”

The short answer? Yes and no.

While there are elements of the CRM framework that can be accelerated, there’s no real shortcut to achieving a quality outcome. However, there are smart ways to get meaningful risk controls in place quickly, buying valuable time while the full system matures.

Let’s explore what that looks like in practice.

The Traditional Approach

A typical Critical Risk Management implementation follows a structured, end-to-end process that applies whether it’s your first rollout or your fiftieth. The main steps usually include:

  1. Broad-Brush Risk Assessment: Identify your organization’s critical risks.
  2. Detailed Risk Analysis (e.g., Bow-Tie Analysis): Understand each critical risk and the controls that prevent or mitigate it.
  3. Define Critical Controls: From the bow-tie, determine which controls are essential to preventing serious incidents.
  4. Develop Performance Standards: Set clear expectations for how each control must perform.
  5. Design Verification Strategies: Plan how you’ll test and confirm that each control is working.
  6. Verification in the Field: Conduct ongoing checks, audits, and verifications.

When done thoroughly, this process can easily take up to two years and for good reason. Each phase generates new learnings, improvements, and system updates.

But what if you can’t wait that long to start verifying your most important controls?

The Fast-Track Approach

It’s possible to fast-track part of the CRM framework by jumping from your broad-brush risk assessment directly to generic critical control verification checklists — allowing you to start field verifications in weeks rather than years.

Here’s how it works:

  1. Start with Known Critical Risks
    In most industries — for example, mining — about 80% of critical risks are well understood. These might include working at heights, vehicle interactions, or confined spaces.
  2. Use Generic Industry-Level Controls
    For each critical risk, draw from an established library (e.g., your internal “Impress Library”) of generic critical controls.
    Example: For the risk of “falling from height,” one critical control might be “fit-for-purpose equipment.”
  3. Create Simple Verification Checklists
    For each control, create 3–5 straightforward verification questions.
    • Are workers using approved harnesses?
    • Is all fall arrest equipment inspected and tagged?
    • Are anchor points rated and secure?
    These can fit on a one- or two-page checklist, simple enough to deploy immediately.
  4. Deploy Quickly to the Frontline
    Frontline teams can use these generic checklists right away to begin verifying critical controls where the exposure actually occurs in the field.

The Benefits

Fast-tracking in this way offers several advantages:

Speed: Implementation can begin within two weeks instead of two years.
Coverage: Generic controls typically cover around 80% of real-world scenarios.
Ease of Use: Simple checklists mean minimal training, they’re “point and shoot.”
Immediate Risk Reduction: You start closing obvious gaps fast, especially at the frontline.

The Limitations

Of course, this approach isn’t perfect. There are trade-offs:

⚠️ Not All Scenarios Covered: Generic controls won’t capture every local nuance.
⚠️ Lack of Context: The approach isn’t tailored to your organization’s unique environment, systems, or risk drivers.
⚠️ System-Level Gaps: These checklists focus on frontline execution, not underlying systems like maintenance, procurement, or training.
⚠️ Potential for Complacency: Teams may feel “we’ve got it covered,” when deeper system work still needs to be done.
⚠️ Strategic Work Still Required: The full CRM framework, including performance standards and detailed bow-tie analysis, must still follow.

The Smart Way Forward

Think of this approach as a temporary accelerator, not a replacement. It helps organizations de-risk quickly while buying time to design and implement a full critical risk management system.

The key is knowing when to transition from generic to specific. As you develop localized performance standards and system-level verification processes, you can begin to “turn off” the generic tools and “turn on” the tailored ones.

Final Thoughts

There’s no true shortcut to a robust Critical Risk Management framework but there are intelligent ways to fast-track progress.

By using generic controls and checklists as an initial step, you can begin verifying critical controls in the field within weeks, improving safety outcomes and gathering valuable insights.

Just remember: these early wins are a bridge, not a destination. The goal remains a well-designed, context-specific CRM framework that protects your people, assets, and reputation for the long term.

Share this insight

More insights

View All

Ready to Save Lives at Work?

With Impress Solutions, you’re not just getting a service, you’re securing peace of mind with a partner you can trust. 
Book a free consultation today, and let’s map out how we can help you save lives at work.